A review of air quality issues and compliance for the asphalt paving industry in Maryland
Conference
·
OSTI ID:20002243
The Maryland Air and Radiation Management Administration (ARMA) conducted a Sector Initiative in order to achieve a compliance audit of the asphalt paving industry sector in Maryland. This sector is commonly referred to as the hot-mix asphalt (HMA) industry. There are 59 HMA production plants in Maryland. Each asphalt production facility was reviewed to determine their compliance status with federal NSPS requirements (stack particulate and visible emission requirements), as well as with Maryland's more comprehensive and generally more restrictive requirements including visible emission, particulate matter, air toxics, dust, nuisance, odor, and other criteria pollutant requirements. The study included reviewing past data (stack test reports, inspections, VE observations, complaint histories) and conducting new inspections and observations at all 59 of the plants. The study also included conducting new particulate stack tests (Summer of 1998) at nine HMA plants. The historic data demonstrated general compliance with stack-tested particulate emission rates. The new stack tests all demonstrated compliance with applicable particulate limits. Visible emissions observations revealed a lesser degree of compliance. Asphalt plants, if not carefully controlled, can be a major source of nuisance complaints. Complaint histories were also reviewed. This paper presents detailed results of ARMA's compliance review of the asphalt industry in Maryland. This includes test results, compliance determinations, and compliance rates. Other issues including impacts on surrounding communities, changing Department of Transportation requirements, and air toxics requirements are also reviewed.
- Research Organization:
- Maryland Dept. of the Environment, Baltimore, MD (US)
- OSTI ID:
- 20002243
- Report Number(s):
- CONF-990608--
- Country of Publication:
- United States
- Language:
- English
Similar Records
Compliance testing of Grissom Air Force Base Central Heating Plant coal-fired boilers 3, 4, and 5, Grissom Air Force Base, Indiana. Final technical report, 3-21 Feb 92
Compliance testing of Grissom AFB Central Heating Plant coal-fired boilers 3, 4, and 5, Grissom AFB, Indiana. Final report, 29 January-15 February 1989
Standards of performance for new stationary sources asphalt processing and asphalt roofing manufacture: enforcement aspects statement and reports impact analysis
Technical Report
·
Mon Jun 01 00:00:00 EDT 1992
·
OSTI ID:7031976
Compliance testing of Grissom AFB Central Heating Plant coal-fired boilers 3, 4, and 5, Grissom AFB, Indiana. Final report, 29 January-15 February 1989
Technical Report
·
Thu Jun 01 00:00:00 EDT 1989
·
OSTI ID:5195499
Standards of performance for new stationary sources asphalt processing and asphalt roofing manufacture: enforcement aspects statement and reports impact analysis
Technical Report
·
Mon Dec 31 23:00:00 EST 1979
·
OSTI ID:5766135