Pressure safety approach for PIP-II cryogenic distribution system and cryomodules

Conference ·
DOI:https://doi.org/10.2172/1989911· OSTI ID:1989911
The Proton Improvement Plan-II (PIP-II) is a superconducting linear accelerator being built at Fermilab that will provide 800 MeV proton beam for neutrino production. The linac consists of a total of twenty-three (23) cryomodules of five (5) different types. Cooling is required at 2K, 5K and 40K. The Cryogenic Distribution System (CDS) consists of a Distribution Valve Box, ~285 m of cryogenic transfer line, modular Bayonet Cans to interface with cryomodules, and a Turnaround Can. The cryogenic system must provide protection from over-pressure by sizing pressure relief devices for all volumes and process line circuits. The cryomodule cavity circuits have dual pressure ratings, 4.1 bara when cold and 2.05 bara when warm (T>80K). Worst case relieving cases will be identified. The methods for determining heat flux will be presented. For the relieving occurring in the linac tunnel, flow must vent to outside to avoid an oxygen deficiency hazard. Also, we will present vacuum vesse l relief sizing to protect the cryogenic distribution system vacuum shells from over pressure during an internal line rupture. The project is funded by US DOE Offices of Science, High Energy Physics.
Research Organization:
Fermi National Accelerator Laboratory (FNAL), Batavia, IL (United States)
Sponsoring Organization:
USDOE Office of Science (SC), High Energy Physics (HEP) (SC-25)
DOE Contract Number:
AC02-07CH11359
OSTI ID:
1989911
Report Number(s):
FERMILAB-POSTER-23-140-TD; C2Po2A-03; oai:inspirehep.net:2676557
Country of Publication:
United States
Language:
English

Similar Records

Pressure safety approach for PIP-II cryogenic distribution system and cryomodules
Conference · Mon Jul 17 00:00:00 EDT 2023 · OSTI ID:1989921

Precision measurement of the magnetic field in run 1 of the g-2 experiment
Conference · Mon Jul 24 00:00:00 EDT 2023 · OSTI ID:1993293

Warm Compressor system Overview and status of the PIP-II cryogenic system
Conference · Mon Aug 21 00:00:00 EDT 2023 · OSTI ID:1996536