skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Water ingress testing of Pressure Cooker 1006027150 REVAB-021

Technical Report ·
DOI:https://doi.org/10.2172/1988530· OSTI ID:1988530

The requirements of this water ingress test are defined in PA-RD-01009, TA-55 Criticality Safety Requirements. “The container design should be capable of preventing the entry of more than 50 ml water when subjected to water spray at a flow of up to 2 inches water per hour for 2 hours or when immersed in water up to a depth of 6 inches above the top of the container for the same period of time.” The six allen screw fasters on the lid of the container were torqued to approximately 45 inch-pounds with a calibrated torque wrench in a crisscross pattern to ensure equal force distribution. The container management team of ORI-2 has developed a standard practice of gathering 5 data points to increase the statistical confidence in the data. This method has been demonstrated in previous LA-URs and approved official memorandums as follows: LANL Memo, SPE-2: 19-016 dated August 22, 2019; LANL Memo, SPE-2:19-020 dated September 24, 2019; and LA-UR-19-28268, Water Ingress Testing of Commercially Available Containers for the TA-55 Criticality Safety Program.

Research Organization:
Los Alamos National Laboratory (LANL), Los Alamos, NM (United States)
Sponsoring Organization:
USDOE National Nuclear Security Administration (NNSA), Office of Defense Programs (DP)
DOE Contract Number:
89233218CNA000001
OSTI ID:
1988530
Report Number(s):
LA-UR-23-27003
Country of Publication:
United States
Language:
English