Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

LCLS-II Cryomodule Production at JLAB

Conference ·

The LCLS-II cryomodule construction program leverages the mature XFEL cryomodule design to produce technologically sophisticated cryomodules with a minimum of R&D according to an accelerated manufacturing schedule. Jlab, as one of the partner labs, is producing 18 cryomodules for LCLS-II. To meet the quality and schedule demands of LCLS-II, many upgrades to the JLAB cryomodule assembly infrastructure and techniques have been made. JLab has installed a new cleanroom for string assembly and instituted new protocols to minimize particulate transfer into the cavities during the cryomodule construction process. JLab has also instituted a set of magnetic hygiene protocols to be used during the assembly process to minimize magnetic field impingement on the finished cavity structure. The goal has been to have gradients, both maximum and field emission onset, that do not degrade between the cavity vertical test and final cryomodule qualification, while maximizing the Q0 of each finished cavity. Results from the prototype and first production cryomodule assembly are presented.

Research Organization:
Thomas Jefferson National Accelerator Facility, Newport News, VA (United States)
Sponsoring Organization:
USDOE Office of Science (SC), Nuclear Physics (NP)
DOE Contract Number:
AC05-06OR23177
OSTI ID:
1985229
Report Number(s):
JLAB-ACC-17-2526; DOE/OR/23177-4190
Country of Publication:
United States
Language:
English

Similar Records

JLab cryomodule assembly infrastructure modifications for LCLS-II
Conference · Mon Nov 30 23:00:00 EST 2015 · OSTI ID:1645577

MAGNETIC HYGIENE CONTROL ON LCLS-II CRYOMODULES FABRICATED AT JLAB
Conference · Sun Dec 31 23:00:00 EST 2017 · OSTI ID:1985146

Procurements for LCLS-II Cryomodules at Jlab
Conference · Mon Nov 30 23:00:00 EST 2015 · OSTI ID:1645103

Related Subjects