Studies toward a Candidate IDS Neutrino Factory Front-End Configuration
Journal Article
·
· TBD
OSTI ID:1985060
- Fermilab
A front end scenario for the IDS neutrino factory is presented. The scenario is based on the Study 2A example for capture, bunching and phase-energy rotation of muons from a proton source for a neutrino factory, and the goal is the capture of a maximal number of muons in a string of 201.25 MHz rf bunches. We present a candidate release scenario that is somewhat shorter than the Study 2A example and its parameters are optimized for smaller magnetic fields and gradients. We consider the variation of performance with achievable gradient, obtaining acceptable capture with reduced gradients. We also consider variation in production target performance, and develop the specifications toward the practical requirements of the cost study.
- Research Organization:
- Fermi National Accelerator Laboratory (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE Office of Science (SC), High Energy Physics (HEP) (SC-25)
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 1985060
- Report Number(s):
- FERMILAB-PUB-10-648-AD; NFMCC-DOC-546; arXiv:1207.4056; oai:inspirehep.net:861585
- Journal Information:
- TBD, Journal Name: TBD
- Country of Publication:
- United States
- Language:
- English
Similar Records
Muon capture in the front end of the IDS neutrino factory
Configuration of the Muon Collider/Neutrino Factory Front End
Front End for a neutrino factory or muon collider
Conference
·
Tue Dec 31 23:00:00 EST 2002
· Conf.Proc.C100523:wepe068,2010
·
OSTI ID:982230
Configuration of the Muon Collider/Neutrino Factory Front End
Journal Article
·
Sat Oct 01 00:00:00 EDT 2011
· TBD
·
OSTI ID:1423266
Front End for a neutrino factory or muon collider
Journal Article
·
Wed Nov 29 19:00:00 EST 2017
· Journal of Instrumentation
·
OSTI ID:1410422