skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Development & Testing of Industrial Scale, Coal Fired Combustion System, Phase 3

Technical Report ·
DOI:https://doi.org/10.2172/1976· OSTI ID:1976

In the third quarter of calendar year 1997, 10 days of tests on the 20 MMBtu/hr combustor-boiler facility were performed. The total test days on the Philadelphia facility to the end of September 1997 was 93, of which 19 tests were implemented as part of another DOE project. This exceeds the planned 63 test days for this project. Key project objectives have been exceeded, including NO emissions as low as 0.07 lb/MMBtu and SO emissions as low as 0.2 x 2 lb/MMBtu. The tests in the present quarter focussed on further optimizing post-combustion sorbent injection for SO2 and NOx control processes. The results were in the same range as in previous tests. In addition, initial tests of Coal Tech's post-combustion NOx control process were implemented on a 100 MW and a 37 MW utility boiler, and NOx reductions as high as 40% were measured in the latter boiler.

Research Organization:
Federal Energy Technology Center, Morgantown, WV, and Pittsburgh, PA (United States)
Sponsoring Organization:
USDOE
DOE Contract Number:
AC22-91PC91162
OSTI ID:
1976
Report Number(s):
DE-AC22-91PC91162-23; ON: DE00001976
Country of Publication:
United States
Language:
English

Similar Records

Development & Testing of Industrial Scale, Coal Fired Combustion System, Phase 3
Technical Report · Wed Apr 01 00:00:00 EST 1998 · OSTI ID:1976

Development & Testing of Industrial Scale, Coal Fired Combustion System, Phase 3
Technical Report · Sat Jan 17 00:00:00 EST 1998 · OSTI ID:1976

DEVELOPMENT AND TESTING OF INDUSTRIAL SCALE, COAL FIRED COMBUSTION SYSTEM, PHASE 3
Technical Report · Thu Mar 11 00:00:00 EST 1999 · OSTI ID:1976