Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

The Beam Splitter for the Project X

Conference · · Conf.Proc.C
OSTI ID:1967409
In the Project X facility, a 3 GeV, H- CW beam is delivered to three users simultaneously by way of selectively filling appropriate RF buckets at the front end of the linac and then RF splitting them to three different target halls. With the desire to split the H- beam three ways, an RF separator directs two quarters of the beam to one user (Mu2e), one quarter to another user (Kaon), and one quarter to the third (unidentified) user. The natural way is to use a SC structure with the deflecting TM110 mode. Basic requirements to the deflecting RF structure are formulated and design of the deflecting SC cavities is presented.
Research Organization:
Fermi National Accelerator Laboratory (FNAL), Batavia, IL (United States)
Sponsoring Organization:
USDOE Office of Science (SC), High Energy Physics (HEP) (SC-25)
DOE Contract Number:
AC02-07CH11359
OSTI ID:
1967409
Report Number(s):
FERMILAB-CONF-10-684-APC; IPAC-2010-WEPEC059; oai:inspirehep.net:869483
Conference Information:
Journal Name: Conf.Proc.C Journal Volume: 100523
Country of Publication:
United States
Language:
English

Similar Records

The Project-X 3 GeV Beam Distribution System
Conference · Tue May 01 00:00:00 EDT 2012 · Conf.Proc.C1205201:2651-2653,2012 · OSTI ID:1048911

Resonance effects of longitudinal HOMS in Project X linac
Conference · Mon Feb 28 23:00:00 EST 2011 · OSTI ID:1012417

Physics design of front ends for superconducting ion linacs
Conference · Mon Sep 01 00:00:00 EDT 2008 · OSTI ID:939204

Related Subjects