Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

R.F. Requirements for Matching the Precooler $$\overline{p}$$ Bunches into the Booster

Technical Report ·
DOI:https://doi.org/10.2172/1962646· OSTI ID:1962646
 [1]
  1. Fermi National Accelerator Laboratory (FNAL), Batavia, IL (United States)
The non-accelerating $$\overline{p}$$ bunches in the Precooler must be extracted and matched into the Booster decelerating R.F. buckets. In this report it has been assumed that the Booster is operating between .2 GeV and 8 GeV (kinetic energy) at 15 Hz and that the R.F. system is using the 84th harmonic.
Research Organization:
Fermi National Accelerator Laboratory (FNAL), Batavia, IL (United States)
Sponsoring Organization:
USDOE Office of Science (SC), High Energy Physics (HEP)
DOE Contract Number:
AC02-07CH11359
OSTI ID:
1962646
Report Number(s):
FERMILAB-PBAR-NOTE-017A; oai:inspirehep.net:846596
Country of Publication:
United States
Language:
English

Similar Records

Bunch Rotation in the Main Ring and $\overline{p}$ Debunching in a Circular Debuncher - Simulation Results
Technical Report · Sat Aug 01 00:00:00 EDT 1981 · OSTI ID:1967408

Deceleration in the Precooler
Technical Report · Fri Aug 17 00:00:00 EDT 1979 · OSTI ID:1969326

Simulations of Merging and Squeezing Bunches in Booster and AGS
Technical Report · Mon Jul 30 00:00:00 EDT 2012 · OSTI ID:1062004