Analysis of core uncovery time in Kuosheng station blackout transient with MELCOR
Journal Article
·
· Nuclear Technology
OSTI ID:194909
- Inst. of Nuclear Energy Research, Lungtan (Taiwan, Province of China)
The MELCOR code, developed by the Sandia National Laboratories, is capable of simulating severe accident phenomena of nuclear power plants. Core uncovery time is an important parameter in the probabilistic risk assessment. However, many MELCOR users do not generate the initial conditions in a station blackout (SBO) transient analysis. Thus, achieving reliable core uncovery time is difficult. The core uncovery time for the Kuosheng nuclear power plant during an SBO transient is analyzed. First, full-power steady-state conditions are generated with the application of a developed self-initialization algorithm. Then the response of the SBO transient up to core uncovery is simulated. The effects of key parameters including the initialization process and the reactor feed pump (RFP) coastdown time on the core uncovery time are analyzed. The initialization process is the most important parameter that affects the core uncovery time. Because SBO transient analysis, the correct initial conditions must be generated to achieve a reliable core uncovery time. The core uncovery time is also sensitive to the RFP coastdown time. A correct time constant is required.
- OSTI ID:
- 194909
- Journal Information:
- Nuclear Technology, Journal Name: Nuclear Technology Journal Issue: 2 Vol. 113; ISSN 0029-5450; ISSN NUTYBB
- Country of Publication:
- United States
- Language:
- English
Similar Records
Analysis of Kuosheng Station Blackout Accident Using MELCOR 1.8.4
Analysis of Kuosheng Large-Break Loss-of-Coolant Accident with MELCOR 1.8.4
Analysis of long-term station blackout at Peach Bottom using MELCOR
Journal Article
·
Tue Nov 14 23:00:00 EST 2000
· Nuclear Technology
·
OSTI ID:20822213
Analysis of Kuosheng Large-Break Loss-of-Coolant Accident with MELCOR 1.8.4
Journal Article
·
Fri Sep 15 00:00:00 EDT 2000
· Nuclear Technology
·
OSTI ID:20822194
Analysis of long-term station blackout at Peach Bottom using MELCOR
Conference
·
Sun Dec 31 23:00:00 EST 1989
· Transactions of the American Nuclear Society; (United States)
·
OSTI ID:7089057