Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Rod pumping and proppant flowback at the Lost Hills Field

Conference ·
OSTI ID:191888

Proppant flowback from hydraulically fractured wells can lead to sand wear on the pump barrel and plunger and increased pulling costs on rod pumped wells. Two approaches for lengthening run times of the pumps were tried. One approach was to install pumps that will allow production of a sand laden fluid. Pressure actuated plunger (PAP) pumps were field tested and showed an average increase of 81.6% in run time. These split ring wiper pumps clean the barrel of sand prior to the passing of the plunger. The other approach was to keep the sand and from entering the pumps. When down hole filters were utilized, run life of the pumps with the filters increases 135%. Well pulling cost savings of $11.91 per well-day and $9.24 per well-day are documented for the PAP pumps and filters, respectively. Application guidelines based on the sand loading rate and gross liquid production of the wells are presented, as well as some operational experiences.

OSTI ID:
191888
Report Number(s):
CONF-951002--
Country of Publication:
United States
Language:
English

Similar Records

Fiber/proppant mixtures control proppant flowback in South Texas
Conference · Sat Dec 30 23:00:00 EST 1995 · OSTI ID:166616

Proppant flowback control additives
Conference · Mon Dec 30 23:00:00 EST 1996 · OSTI ID:468117

Factors affecting proppant flowback with resin coated proppants
Conference · Sat Dec 30 23:00:00 EST 1995 · OSTI ID:379621