Multimedia models of human exposure to industrial emissions through food products: Identifying the critical pathways
- Univ. of California, Davis, CA (United States). Risk Science Program
The magnitude of potential human exposure through foods can be and has been assessed through food-product samples. Reducing these exposures requires that measuring not only the exposure media (food) concentrations but also defining the processes that link various contaminant sources to food. The authors present here a general approach for quantifying human exposure to contaminants in home-grown foods using four factors-ambient environmental concentrations in air and soil; bioconcentration factors between air, soil, leaves, and roots; translocations from leaves and roots to edible-plant parts; and human activity patterns associated with consumption of home-grown food products. The authors combined these factors in a general model and used sensitivity analyses to assess the important contributions to the imprecision of exposure estimates. Despite large uncertainties about human activities, they found the major source of uncertainty (variance) in exposure estimates is attributable to imprecision in quantifying bioconcentration. This is especially evident for persistent and fat-soluble compounds--such as PCBs, PAHs, dioxins, and furans. The evaluation of analytical and theoretical methods used to characterize bioconcentration factors reveals that molecular connectivity indices (MCIs) based on molecular structure are better predictors of bioconcentration in plants than are the solubility factors currently in use. The authors describe ongoing laboratory experiments in exposure chambers with garden foods such as leafy vegetables and root crops. They then assess the ability of these methods to better define chemical mass transfers among the components of the home-garden system-air, soil-organic phases, soil solution, plant roots, and plant leaves.
- OSTI ID:
- 191297
- Report Number(s):
- CONF-9511137-; ISBN 1-880611-03-1; TRN: IM9610%%298
- Resource Relation:
- Conference: 2. Society of Environmental Toxicology and Chemistry (SETAC) world conference, Vancouver (Canada), 5-9 Nov 1995; Other Information: PBD: 1995; Related Information: Is Part Of Second SETAC world congress (16. annual meeting): Abstract book. Global environmental protection: Science, politics, and common sense; PB: 378 p.
- Country of Publication:
- United States
- Language:
- English
Similar Records
Uptake and physiological response of crop plants irrigated with water containing RDX and TNT
Radiological Performance Modeling: Platform Comparison