Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Status of SNS Proton Power Upgrade SRF Cavities Production Qualification

Conference ·
 [1];  [1];  [1];  [1];  [1];  [1];  [1];  [1];  [2];  [2];  [1]
  1. Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States)
  2. Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)
The Pro­ton Power Up­grade pro­ject at Oak Ridge Na­tional Lab’s Spal­la­tion Neu­tron Source (SNS PPU) cur­rently being con­structed will dou­ble the pro­ton beam power from 1.4 to 2.8 MW by adding 7 ad­di­tional cry­omod­ules, each con­tains four six-cell high beta (\beta = 0.81) su­per­con­duct­ing radio fre­quency cav­i­ties. The cav­i­ties were built by Re­search In­stru­ments, Ger­many, with all the cav­ity pro­cess­ing done at the ven­dor site, in­clud­ing elec­trop­o­l­ish­ing as the final ac­tive chem­istry step. All 28 cav­i­ties needed for 7 cry­omod­ules were de­liv­ered to Jef­fer­son Lab, ready to be tested. The cryo­genic RF qual­i­fi­ca­tions and he­lium ves­sel weld­ing were done at Jef­fer­son Lab. The per­for­mance largely ex­ceed the re­quire­ments, and greatly ex­ceeded the per­for­mance of the orig­i­nal SNS cav­ity pro­duc­tion se­ries. Here, we pre­sent the sum­mary of RF test on pro­duc­tion cav­i­ties to this date.
Research Organization:
Thomas Jefferson National Accelerator Facility, Newport News, VA (United States); Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)
Sponsoring Organization:
USDOE Office of Science (SC), Nuclear Physics (NP)
DOE Contract Number:
AC05-06OR23177
OSTI ID:
1905535
Report Number(s):
JLAB-ACC-21-3429; DOE/OR/23177-5250
Country of Publication:
United States
Language:
English

Similar Records

Status of SNS Proton Power Upgrade SRF Cavities Production Qualification
Conference · Tue Jun 01 00:00:00 EDT 2021 · OSTI ID:1905540

Operational Experience of the New Booster Cryomodule at the Upgraded Injector Test Facility
Conference · Mon Aug 01 00:00:00 EDT 2022 · OSTI ID:2204604

Operational Experience of the New Booster Cryomodule at the Upgraded Injector Test Facility
Conference · Thu Sep 01 00:00:00 EDT 2022 · OSTI ID:1903337

Related Subjects