Beam Commissioning and Integrated Test of the PIP-II Injector Test Facility

Conference · · JACoW
 [1];  [1];  [1];  [1];  [1];  [1];  [1];  [1];  [1];  [1];  [1];  [1];  [1];  [1];  [1];  [1];  [1];  [1];  [1];  [1] more »;  [1];  [1];  [1];  [1];  [1];  [1];  [1];  [1];  [1];  [2];  [1];  [1];  [1];  [2];  [1];  [1];  [1];  [1];  [1];  [1];  [1];  [1];  [2];  [1];  [1];  [2];  [1];  [1];  [1];  [1];  [1] « less
  1. Fermilab
  2. Bhabha Atomic Res. Ctr.
The PIP-II Injector Test (PIP2IT) facility is a near-complete low energy portion of the Superconducting PIP-II linac driver. PIP2IT comprises the warm front end and the first two PIP-II superconducting cryomodules. PIP2IT is designed to accelerate a 2 mA H⁻ beam to an energy of 20 MeV. The facility serves as a testbed for a number of advanced technologies required to operate PIP-II and provides an opportunity to gain experience with commissioning of the superconducting linac, significantly reducing project technical risks. Some PIP2IT components are contributions from international partners, who also lend their expertise to the accelerator project. The project has been successfully commissioned with the beam in 2021, demonstrating the performance required for the LBNF/DUNE. In this paper, we describe the facility and its critical systems. We discuss our experience with the integrated testing and beam commissioning of PIP2IT, and present commissioning results. This important milestone ushers in a new era at Fermilab of proton beam delivery using superconducting radio-frequency accelerators.
Research Organization:
Bhabha Atomic Res. Ctr.; Fermi National Accelerator Laboratory (FNAL), Batavia, IL (United States)
Sponsoring Organization:
US Department of Energy
DOE Contract Number:
AC02-07CH11359
OSTI ID:
1898752
Report Number(s):
FERMILAB-CONF-22-803-AD-PIP2-TD; oai:inspirehep.net:2175276
Resource Type:
Conference paper
Conference Information:
Journal Name: JACoW
Country of Publication:
United States
Language:
English

Similar Records

PIP-II Project Overview and Status
Conference · Sun Sep 24 20:00:00 EDT 2023 · JACoW · OSTI ID:2212422

Beam Dynamics Studies at the PIP-II Injector Test Facility
Conference · Wed Aug 24 00:00:00 EDT 2022 · OSTI ID:1883586

Installation, commissioning, and testing of the HB650 CM at PIP2IT
Conference · Sun Dec 31 19:00:00 EST 2023 · IOP Conf.Ser.Mater.Sci.Eng. · OSTI ID:1996516

Related Subjects