Energy Northwest – Horn Rapids Solar and Storage: A Techno-economic Assessment
- Pacific Northwest National Lab. (PNNL), Richland, WA (United States)
In 2017, as part of the second round of funding from the Washington State Clean Energy Fund, the Washington State Department of Commerce granted up to $$\$$3$$ million in matching funds to develop an estimated $6.5 million project that deployed a 4-MW, 20-acre solar generating array of photovoltaic (PV) panels coupled with a 1 MW/4 MWh (nameplate capacity) lithium-iron-phosphate battery energy storage system (BESS) in Richland, Washington. The combination of PV and BESS will provide a predictable, renewable generating source and will also serve as a training ground for solar and battery technicians throughout the nation. This report documents the techno-economic assessment of the integrated system, including the definition of use cases and applications, collection and preparation of data and input parameters, development of modeling and optimization methods, case studies, and analysis results.
- Research Organization:
- Pacific Northwest National Laboratory (PNNL), Richland, WA (United States)
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- AC05-76RL01830
- OSTI ID:
- 1894860
- Report Number(s):
- PNNL-ACT-10125
- Country of Publication:
- United States
- Language:
- English
Similar Records
Energy Northwest - Horn Rapids Solar and Storage: An Assessment of Battery Technical Performance
Avista’s Shared Energy Economy Model Pilot: A Techno-economic Assessment
OPALCO - Decatur Island Solar and Energy Storage Project: An Assessment of Battery Technical Performance
Technical Report
·
Wed Jun 01 00:00:00 EDT 2022
·
OSTI ID:1877859
Avista’s Shared Energy Economy Model Pilot: A Techno-economic Assessment
Technical Report
·
Fri Jul 01 00:00:00 EDT 2022
·
OSTI ID:1887859
OPALCO - Decatur Island Solar and Energy Storage Project: An Assessment of Battery Technical Performance
Technical Report
·
Wed Jun 01 00:00:00 EDT 2022
·
OSTI ID:1975282