Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Energy Northwest – Horn Rapids Solar and Storage: A Techno-economic Assessment

Technical Report ·
DOI:https://doi.org/10.2172/1894860· OSTI ID:1894860
In 2017, as part of the second round of funding from the Washington State Clean Energy Fund, the Washington State Department of Commerce granted up to $$\$$3$$ million in matching funds to develop an estimated $6.5 million project that deployed a 4-MW, 20-acre solar generating array of photovoltaic (PV) panels coupled with a 1 MW/4 MWh (nameplate capacity) lithium-iron-phosphate battery energy storage system (BESS) in Richland, Washington. The combination of PV and BESS will provide a predictable, renewable generating source and will also serve as a training ground for solar and battery technicians throughout the nation. This report documents the techno-economic assessment of the integrated system, including the definition of use cases and applications, collection and preparation of data and input parameters, development of modeling and optimization methods, case studies, and analysis results.
Research Organization:
Pacific Northwest National Laboratory (PNNL), Richland, WA (United States)
Sponsoring Organization:
USDOE
DOE Contract Number:
AC05-76RL01830
OSTI ID:
1894860
Report Number(s):
PNNL-ACT-10125
Country of Publication:
United States
Language:
English

Similar Records

Energy Northwest - Horn Rapids Solar and Storage: An Assessment of Battery Technical Performance
Technical Report · Wed Jun 01 00:00:00 EDT 2022 · OSTI ID:1877859

Avista’s Shared Energy Economy Model Pilot: A Techno-economic Assessment
Technical Report · Fri Jul 01 00:00:00 EDT 2022 · OSTI ID:1887859

OPALCO - Decatur Island Solar and Energy Storage Project: An Assessment of Battery Technical Performance
Technical Report · Wed Jun 01 00:00:00 EDT 2022 · OSTI ID:1975282