Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Bad River Band of Lake Superior Chippewa Indians Solar Project

Technical Report ·
DOI:https://doi.org/10.2172/1889885· OSTI ID:1889885
 [1]
  1. Bad River Band of Lake Superior Tribe of Chippewa, Odanah, WI (United States); Bad River Band of Lake Superior Tribe of Chippewa
The Bad River Band of Lake Superior Chippewa (the Tribe) implemented its first phase of energy independence through the installation of approximately 520 kW DC of solar photovoltaic (PV) at three tribal buildings: 200kW DC at the Wastewater Treatment Plant (WWTP), 300 kW DC at the Health & Wellness Center (Health Clinic), and 20 kW AC at the Chief Blackbird Administration Building (Administration Building). The solar PV systems were integrated with the existing utility grid and can operate independent of the grid using Battery Energy Storage Systems (BESS) in combination with solar and existing back-up gas generators. The BESS also creates resiliency, providing power when the grid is down. All three buildings are essential Tribal buildings.
Research Organization:
Bad River Band of Lake Superior Tribe of Chippewa, WI (United States)
Sponsoring Organization:
USDOE Office of Indian Energy Policy & Programs (IE)
Contributing Organization:
Madison Solar Consulting; muGrid Analytics; Cheq Bay Renewables; Mashkiiziibii NRD; Faith Technology
DOE Contract Number:
IE0000115
OSTI ID:
1889885
Report Number(s):
DE-IE0000115
Country of Publication:
United States
Language:
English

Similar Records

Sokaogon Chippewa Community Emission-Free and Treaty Resource Protection Clean Energy Initiative
Technical Report · Fri Mar 30 00:00:00 EDT 2018 · OSTI ID:1430664

Red Lake Band of Chippewa Indians response to the draft area recommendation report
Technical Report · Mon Apr 14 23:00:00 EST 1986 · OSTI ID:6206330

Oglala Omaste 2020
Technical Report · Thu Oct 19 00:00:00 EDT 2023 · OSTI ID:2274755