skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: IER 555: Godiva Benchmark Update CED-2 (Final Design Report)

Technical Report ·
DOI:https://doi.org/10.2172/1887118· OSTI ID:1887118

The International Criticality Safety Benchmark Evaluation Project (ICSBEP) evaluation of the Godiva IV critical assembly, HEU-MET-FAST-086: GODIVA-IV DELAYED-CRITICAL EXPERIMENTS (HMF-086), was completed by Russ Mosteller. Five critical experiment configurations performed at the Los Alamos National Laboratory (LANL) Technical Area (TA)-18 were evaluated as acceptable benchmark cases. The five cases consist of four delayed critical configurations which differ in control rod positions and one prompt critical configuration. All cases calculated a lower $$k_{eff}$$ than measured by experiment. This data is referred to as the TA-18 Godiva IV benchmark in this report. In 2005, Godiva IV was disassembled for relocation to the Nevada Test Site (NTS), now Nevada National Security Site (NNSS), at the National Criticality Experiments Research Center (NCERC). Following the disassembly and subsequent reassembly and startup of Godiva IV at NCERC, additional information about the Godiva IV components was obtained. An errata note was added to the HMF-086 evaluation in the ICSBEP handbook to provide this new information until a revision to the benchmark evaluation could be performed. In addition to those corrections, there are differences between the Godiva IV assembly at TA-18 and the Godiva IV assembly at NCERC. These differences include both assembly-specific differences (differences in the safety block gap, differences in the control rod positions, a new NCERC Top Hat and contamination shield) as well as environmental differences, such as the size and shape of the experimental building where the assembly is located. An additional model with similar cases, referred to as the NCERC Godiva IV benchmark in this report, will be added to the revised HMF-086 to capture these additional differences. This will provide the best benchmark model of Godiva for use by those performing experiments at NCERC. The IER 555 CED-2 report documents the information that will be updated in the HMF-086 revision, both the corrections to the TA-18 Godiva IV benchmark and the subsequent changes to create a NCERC Godiva IV benchmark. It describes the measurements that will be performed for cases similar to those performed at TA-18. It also describes measurements that will be included in the evaluation as additional data.

Research Organization:
Los Alamos National Laboratory (LANL), Los Alamos, NM (United States)
Sponsoring Organization:
USDOE National Nuclear Security Administration (NNSA)
DOE Contract Number:
89233218CNA000001
OSTI ID:
1887118
Report Number(s):
LA-UR-22-28560; TRN: US2308940
Country of Publication:
United States
Language:
English