EPICS release 3.11 specific documentation -- EPICS release notes for 3.11
EPICS release 3.11 is now ready for user testing. A person who wants to set up a simplified application environment to boot an IOC and create databases using R3.11 should follow the directions in Appendix B, page 27, of the EPICS Source/Release Control Manual, Sept. 20, 1993. The R3.11 EPICS path at ANL/APS is /net/phebos/epics/R3.11 so the command to get the new release is /net/phebos/epics/R3.11/Unix/share/bin/getrel /net/phebos/epics/R3.11. An existing R3.8 short form report can be copied to this new directory and used to create a database. ANL/APS is currently testing an Application Developers Source/Release control system. It is not yet ready for general distribution. Attached are the EPICS R3.11 release notes.
- Research Organization:
- Argonne National Lab., IL (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- W-31109-ENG-38
- OSTI ID:
- 188638
- Report Number(s):
- ANL/ASD/RP--87268; ON: DE96005323
- Country of Publication:
- United States
- Language:
- English
Similar Records
EPICS : input / output controller (IOC) application developer's guide. EPICS release 3.12 specific documentation.[Experimental Physics and Industrial Control System]
Control system for insertion devices at the Advanced Photon Source