Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Validation of the 650 MHz SRF Tuner on the Low and High Beta Cavities for PIP-II at 2 K

Conference · · JACoW

The PIP-II linac will include thirty-six B_{G}=0.61 and twenty-four B_{G}=0.92 650 MHz 5 cell elliptical SRF cavities. Each cavity will be equipped with a tuning system consisting of a double lever slow tuner for coarse frequency tuning and a piezoelectric actuator for fine frequency tuning. The same tuner will be used for both the B_{G}=0.61 and B_{G}=0.92 cavities. Results of testing the cavity-tuner system for the B_{G}=0.61 will be presented for the first time.

Research Organization:
Fermi National Accelerator Laboratory (FNAL), Batavia, IL (United States)
Sponsoring Organization:
US Department of Energy
DOE Contract Number:
89243024CSC000002; AC02-07CH11359
OSTI ID:
1881941
Report Number(s):
FERMILAB-CONF-22-582-TD; arXiv:2208.06315; oai:inspirehep.net:2135655
Journal Information:
JACoW, Journal Name: JACoW
Country of Publication:
United States
Language:
English

Similar Records

Validation of the 650 MHz SRF Cavity Tuner for PIP-II at 2 K
Conference · Thu May 19 20:00:00 EDT 2022 · JACoW · OSTI ID:1898776

Performance of the 650 MHZ SRF Cavity Tuner for PIP-II Project
Conference · Fri Aug 16 20:00:00 EDT 2019 · No journal information · OSTI ID:1565945

Testing of the SSR2 SRF Cavity Tuner for PIP-II at 2 K
Conference · Thu Sep 05 00:00:00 EDT 2024 · No journal information · OSTI ID:2440246

Related Subjects