Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Spent nuclear fuel characterization for a bounding reference assembly for the receiving basin for off-site fuel

Journal Article · · Transactions of the American Nuclear Society
OSTI ID:186617
; ;  [1]
  1. Westinghouse Savannah River Company, Aiken, SC (United States); and others
A basis for interim operation 1 (BIO) for the receiving basin for off-site fuel (RBOF) facility at the U.S. Department of Energy`s (DOE) Savannah River site nuclear materials production complex has been developed in accordance to draft DOE-STD-0019-93 (Ref. 2). The latter document requires a hazard categorization per DOE-STD-1027-92 (Ref. 3) for the safety analysis portion of the BIO. This classification places the facility in one of three categories as defined in DOE 5480.23 (Ref. 4) per the total radioactivity, which can be released during an accident. The diversity of spent nuclear fuels stored in the RBOF made an exacting assessment of the total radioactive inventory virtually impossible. This restriction led to a conservative calculation based on the concept of a hypothetical bounding reference fuel assembly (RFA) integrated over the total capacity of the facility. The RFA is derived from a systematic ranking of the real assemblies (current and expected) according to a maximum burnup criterion. The indicated scheme is not only simple but precluded a potential delay in the completion of the BIO.
OSTI ID:
186617
Report Number(s):
CONF-950601--
Journal Information:
Transactions of the American Nuclear Society, Journal Name: Transactions of the American Nuclear Society Vol. 72; ISSN 0003-018X; ISSN TANSAO
Country of Publication:
United States
Language:
English