The D0 central track trigger
Journal Article
·
· IEEE Trans.Nucl.Sci.
An overview of the system architecture and algorithms used for the DO Central Track Trigger (CTT) in the Run 2 of the Fermilab Tevatron Proton-Antiproton Collider is presented. This system uses information from the newly commissioned Central Fiber Tracker and Preshower Detectors to generate Level 1 trigger decisions. It also generates lists of seed tracks and preshower clusters that are sent to the Level 1 Muon Trigger, L2 Silicon Track Trigger, and Central and Forward Preshower Level 2 preprocessors. The system consists of modular boards which utilize field-programmable gate arrays (FPGAs) to implement trigger algorithms. The system delivers trigger decisions every 132 ns, based on input data flowing at a maximum sustained rate of 475 gigabits per second. The first results of trigger efficiency studies are presented.
- Research Organization:
- Fermi National Accelerator Laboratory (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE Office of Science (SC), High Energy Physics (HEP) (SC-25)
- Contributing Organization:
- D0CTT Group
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 1854866
- Report Number(s):
- FERMILAB-PUB-03-157-E; oai:inspirehep.net:629607
- Journal Information:
- IEEE Trans.Nucl.Sci., Journal Name: IEEE Trans.Nucl.Sci. Vol. 51
- Country of Publication:
- United States
- Language:
- English
Similar Records
Performance measurement of the upgraded D0 central track trigger
The level 1 central tracking trigger for the D-Zero upgrade
Upgrade and Operation of the DZero Central Track Trigger
Conference
·
Thu Nov 30 23:00:00 EST 2006
·
OSTI ID:899992
The level 1 central tracking trigger for the D-Zero upgrade
Conference
·
Thu Jul 22 00:00:00 EDT 1999
·
OSTI ID:9071
Upgrade and Operation of the DZero Central Track Trigger
Conference
·
Sun Apr 01 00:00:00 EDT 2007
·
OSTI ID:909894