Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Vertical Septum Magnet Design for the APS Upgrade

Conference ·

The vertical injection scheme proposed for the APS Upgrade (APS-U) Project requires a challenging septum magnet that must meet stringent beam physics, magnetic field leakage, and vacuum requirements. The current iteration of this magnet design includes an enlarged stored-beam chamber aperture of 9 mm x 12 mm and a reduction of the septum thickness to 1.5 mm. The enlarged aperture accommodates a non-evaporable getter (NEG)-coated stored beam chamber to better achieve the required vacuum. A prototype septum magnet has been built and measurements confirm the cancellation of a peak leakage field even though the value is six times larger than the design. The leakage field measured at the upstream (US) end cancels the downstream (DS) end as was expected by design. The measured and simulated leakage field and the stored beam trajectories are reported.

Research Organization:
Fermi National Accelerator Laboratory (FNAL), Batavia, IL (United States); Argonne National Laboratory (ANL), Argonne, IL (United States); SLAC National Accelerator Laboratory (SLAC), Menlo Park, CA (United States)
Sponsoring Organization:
USDOE Office of Science (SC), High Energy Physics (HEP) (SC-25)
DOE Contract Number:
AC02-07CH11359
OSTI ID:
1854818
Report Number(s):
FERMILAB-CONF-21-819-TD; oai:inspirehep.net:2020114
Country of Publication:
United States
Language:
English

Similar Records

SEPTUM MAGNET DESIGN FOR THE APS-U
Conference · Sun Jun 25 00:00:00 EDT 2017 · OSTI ID:1394615

A concept for canceling the leakage field inside the stored beam chamber of a septum magnet
Journal Article · Tue Dec 19 23:00:00 EST 2017 · Nuclear Instruments and Methods in Physics Research. Section A, Accelerators, Spectrometers, Detectors and Associated Equipment · OSTI ID:1437276

The APS thin pulsed septum magnets
Conference · Fri Jul 01 00:00:00 EDT 1994 · OSTI ID:10166366