The HWR (half-wave-resonator) cryomodule is the first one in the superconducting section of the PIP-II LINAC project at Fermilab. PIP-II IT is a test facility for the project where the injector, warm front-end, and the first two superconducting cryomodules are being tested. The HWR cryomodule comprises 8 cavities operating at a frequency of 162.5 MHz and accelerating beam up to 10 MeV. Resonance control of the cavities is performed with a pneumatically operated slow tuner which compresses the cavity at the beam ports. Helium gas pressure in a bellows mounted to an end wall of the cavity is controlled by two solenoid valves, one on the pressure side and one on the vacuum side. The resonant frequency of the cavity can be controlled in one of two modes. A pressure feedback control loop can hold the cavity tuner pressure at a fixed value for the desired resonant frequency. Alternately, the feedback loop can regulate the cavity tuner pressure to bring the RF detuning error to zero. The resonance controller is integrated into the LLRF control system for the cryomodule. The control system design and performance of the resonance control system are described in this paper.
- Research Organization:
- Fermi National Accelerator Laboratory (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE Office of Science (SC), High Energy Physics (HEP) (SC-25)
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 1854778
- Report Number(s):
- FERMILAB-CONF-21-831-AD; oai:inspirehep.net:2019351
- Country of Publication:
- United States
- Language:
- English
Similar Records
Performance of the LLRF System for the Fermilab PIP-II Injector Test
Calibration and Measurement techniques in the LLRF systems of the Fermilab PIP-II Linac
Warm Front End Upgrade for the PIP-II Linac
Conference
·
Tue Aug 10 00:00:00 EDT 2021
·
OSTI ID:1854819
Calibration and Measurement techniques in the LLRF systems of the Fermilab PIP-II Linac
Conference
·
Wed Nov 06 23:00:00 EST 2024
·
OSTI ID:2476986
Warm Front End Upgrade for the PIP-II Linac
Conference
·
Thu Nov 13 23:00:00 EST 2025
· No journal information
·
OSTI ID:3008848