Title: Y-12 Groundwater Protection Program Groundwater and Surface Water Sampling and Analysis Plan for Calendar Year 2022

Technical Report ·
DOI:https://doi.org/10.2172/1845081· OSTI ID:1845081

This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2022 at the U.S. Department of Energy Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring will be performed in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley and the Chestnut Ridge Regime is located south of Y-12. Additional surface water monitoring will be performed north of Pine Ridge along the boundary of the Oak Ridge Reservation. The following sections of this report provide details regarding the CY 2022 groundwater and surface water monitoring activities. Section 2 describes the monitoring locations in each regime and the processes used to select the sampling locations. A description of the field measurements and laboratory analytes is provided in Section 3. Sample collection methods and procedures are described in Section 4, and Section 5 lists the documents cited for more detailed operational and technical information.

Research Organization:
Oak Ridge Y-12 Plant (Y-12), Oak Ridge, TN (United States)
Sponsoring Organization:
USDOE
Contributing Organization:
Elvado Environmental LLC
DOE Contract Number:
NA0001942; 4300169187
OSTI ID:
1845081
Report Number(s):
IROS42194; Y/SUB/21-169187/2
Country of Publication:
United States
Language:
English