Beam Instrumentation Challenges for the Fermilab PIP-II Accelerator
- Fermilab
Fermilab is undertaking the development of a new 800 MeV superconducting RF linac to replace it’s present normal conducting 400 MeV linac. The PIP-II linac warm front-end consists of an ion source, LEBT, RFQ and MEBT which includes an arbitrary pattern bunch chopper, to generate a 2.1 MeV, 2mA H⁻ beam. This is followed immediately by a series of superconducting RF cryomodules to produce a 800 MeV beam. Commissioning, operate and safety present challenges to the beam instrumentation. This paper describes these beam instrumentation challenges and the choices made for PIP-II.
- Research Organization:
- Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE Office of Science (SC), High Energy Physics (HEP)
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 1843496
- Report Number(s):
- FERMILAB-CONF-19-751-AD-SQMS; oai:inspirehep.net:1822623
- Country of Publication:
- United States
- Language:
- English
Similar Records
PIP-II Injector Test: Challenges and Status
Design of PIP-II Medium Energy Beam Transport
Installation Progress at the PIP-II Injector Test at Fermilab
Conference
·
Tue Oct 04 00:00:00 EDT 2016
·
OSTI ID:1843496
+5 more
Design of PIP-II Medium Energy Beam Transport
Conference
·
Fri Jun 01 00:00:00 EDT 2018
·
OSTI ID:1843496
+3 more
Installation Progress at the PIP-II Injector Test at Fermilab
Conference
·
Tue Oct 04 00:00:00 EDT 2016
·
OSTI ID:1843496
+14 more