Blast Furnace Granular Coal Injection Projection. Annual Report, Jan 1 - Dec 31, 1997

Technical Report ·
DOI:https://doi.org/10.2172/1818· OSTI ID:1818
This 1997 annual report describes the Blast Furnace Granular Coal Injection project being implemented at the Burns Harbor Plant of Bethlehem Steel Corporation. The project is receiving cost-sharing from the U.S. Department of Energy (DOE), and is being administrated by the Morgantown Energy Technology Center in accordance with the DOE Cooperative Agreement No. DE-FC21-91MC27362. This installation is the first in the United States to use British Steel technology1*2 that uses granular coal to provide a portion of the fuel requirements of blast furnaces. The project will demonstrate/assess a broad range of technical and economic issues associated with the use of coal for injection into blast furnaces. To achieve the progmm objectives, the demonstration project is divided into the following three Phases: Phase I - Design Phase II - Construction Phase III - Operation Preliminary Design (Phase 1) began in 1991 with detailed design commencing in 1993. Construction at the Burns Harbor Plant (Phase II) began in August 1993 and was completed at the end of 1994. The demonstration test program (Phase III) started in the fourth quarter of 1995.
Research Organization:
Federal Energy Technology Center, Morgantown, WV, and Pittsburgh, PA
Sponsoring Organization:
USDOE Office of Fossil Energy (FE)
DOE Contract Number:
FC21-91MC27362
OSTI ID:
1818
Report Number(s):
DE-FC21-91MC27362--35; ON: DE00001818
Country of Publication:
United States
Language:
English

Similar Records

Blast Furnace Granulated Coal Injection System Demonstration Project public design report. Topical report
Technical Report · Tue Feb 28 23:00:00 EST 1995 · OSTI ID:95172

Blast furnace granular coal injection project. Annual report, January--December 1995
Technical Report · Mon May 01 00:00:00 EDT 1995 · OSTI ID:255012

Blast furnace granular coal injection project. Annual report, January--December 1994
Technical Report · Sat Jul 01 00:00:00 EDT 1995 · OSTI ID:105085