Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Understanding the Environmental Study Life Cycle in the United States Hydropower Licensing and Federal Authorization Process

Journal Article · · Energies
DOI:https://doi.org/10.3390/en14123435· OSTI ID:1787701

We analyzed United States Federal Energy Regulatory Commission (FERC) documents prepared for 29 recently licensed hydropower projects and created two novel datasets to improve understanding of the environmental study life cycle, defined here as the process that begins with an environmental study being requested by a hydropower stakeholder or regulator, and ends with the study either being rejected or approved/conducted. Our two datasets consisted of summaries of information taken from (1), study determination letters prepared by FERC for 23 projects that were using the integrated licensing process, and (2), environmental study submittals and issuances tracked and attributed to seven projects using the FERC record. Our objective was to use the two resulting environmental life cycle datasets to understand which types of environmental studies are approved, rejected, and implemented during FERC licensing, and how consistently those types of studies are required across multiple hydropower projects. We matched the requested studies to a set of 61 river function indicators in eight categories and found that studies related to the category of biota and biodiversity were requested most often across all 29 projects. Within that category, studies related to river function indicators of presence, absence, detection of species and habitat/critical habitat were the most important to stakeholders, based on the relative number of studies requested. The study approval, rejection, and request rates were similar within each dataset, although the 23 projects with study determination letters had many rejected studies, whereas the dataset created from the seven projects had very few rejected studies.

Sponsoring Organization:
USDOE
Grant/Contract Number:
AC05-00OR22725
OSTI ID:
1787701
Alternate ID(s):
OSTI ID: 1807281
Journal Information:
Energies, Journal Name: Energies Journal Issue: 12 Vol. 14; ISSN 1996-1073; ISSN ENERGA
Publisher:
MDPI AGCopyright Statement
Country of Publication:
Switzerland
Language:
English

References (5)

Review of environmental metrics used across multiple sectors and geographies to evaluate the effects of hydropower development journal March 2019
A synthesis of environmental and recreational mitigation requirements at hydropower projects in the United States journal July 2016
A Checklist of River Function Indicators for hydropower ecological assessment journal October 2019
Challenges in the post-licensing stage of U.S. hydropower development: Current status and some potential solutions journal May 2020
Old and New Threats to Submerged Cultural Landscapes: Fishing, Farming and Energy Development journal March 2009

Similar Records

A Checklist of River Function Indicators for hydropower ecological assessment
Journal Article · Wed Jun 05 00:00:00 EDT 2019 · Science of the Total Environment · OSTI ID:1557494

FERC Hydropower Licensing: A Review of Utilization of the ILP, TLP, and ALP
Technical Report · Mon Jan 28 23:00:00 EST 2019 · OSTI ID:1493399

Related Subjects