Heavy-Duty Electric Fleet Depot Charging Load Profiles & Substation Load Integration Assessment Results
- National Renewable Energy Laboratory; OSTI
- National Renewable Energy Laboratory
- Oncor Electric Delivery Co. LLC
- Oncor Electric Deliver Co. LLC
- Southern Company
This data set includes the 24-hour fleet depot charging load profiles (15-min. average demand) and substation load integration assessment results produced for the study, "Heavy-Duty Truck Electrification and the Impacts of Depot Charging on Electricity Distribution Systems", published in 2021 (https://doi.org/10.1038/s41560-021-00855-0). The code developed to generate these load profiles is publicly available at https://github.com/NREL/hdev-depot-charging-2021. Please cite as: Borlaug, B., Muratori, M., Gilleran, M., Woody, D., Muston, W., Canada, T., Ingram, A., Gresham, H., and McQueen, C., (2021). "Heavy-Duty Truck Electrification and the Impacts of Depot Charging on Electricity Distribution Systems". https://doi.org/10.1038/s41560-021-00855-0.
- Research Organization:
- National Renewable Energy Laboratory - Data (NREL-DATA), Golden, CO (United States); National Renewable Energy Laboratory (NREL), Golden, CO (United States)
- Sponsoring Organization:
- National Renewable Energy Laboratory (NREL), Golden, CO (United States)
- OSTI ID:
- 1787031
- Report Number(s):
- 7.2.0.403 Analytical Modeling at NREL
- Availability:
- datacatalog@nrel.gov
- Country of Publication:
- United States
- Language:
- English
Heavy-duty truck electrification and the impacts of depot charging on electricity distribution systems
|
journal | June 2021 |
Similar Records
Heavy-Duty Truck Electrification and the Impacts of Depot Charging on Electricity Distribution Systems
Results from "Charging Needs for Electric Semi-Trailer Trucks"