Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Sister Rod Destructive Examinations (FY20) Appendix A: Full Length Rod Heat Treatments (FHT)

Technical Report ·
DOI:https://doi.org/10.2172/1764476· OSTI ID:1764476
As a part of the US DOE-NE High Burnup Spent Fuel Data Project, ORNL is performing destructive examinations (DEs) of high burnup (HBU) (>45 gigawatt days per metric ton uranium) spent nuclear fuel (SNF) rods from the North Anna Nuclear Power Station operated by Dominion Energy. The SNF rods, called the “sister rods,” are all HBU and include four different kinds of fuel rod cladding: standard Zircaloy-4, low-tin Zircaloy-4, ZIRLO®, and M5®. The DEs are being conducted to obtain a baseline of the HBU rod’s condition prior to dry storage and are focused on understanding overall SNF rod strength and durability. Both composite fuel and empty cladding are being tested. While the data generated can be used for multiple purposes, a primary goal for obtaining the post-irradiation examination data will support SNF dry storage licensing and relicensing activities.This report documents the status of the ORNL Phase 1 DE activities related to full length rod heat treatments (FHT) applied to selected sister rods in Phase 1 of the sister rod test program. The results of this work and detailed examinations are summarized in the Sister Rod DE Status Report.
Research Organization:
Oak Ridge National Laboratory (ORNL), Oak Ridge, TN (United States)
Sponsoring Organization:
USDOE
DOE Contract Number:
AC05-00OR22725
OSTI ID:
1764476
Report Number(s):
ORNL/SPR-2020/1745; M3SF-20OR010201026
Country of Publication:
United States
Language:
English

Similar Records

Sister Rod Destructive Examinations (FY20) Appendix B: Segmentation, Defueling, Metallograhic Data and Total Cladding Hydrogen
Technical Report · Sun Nov 01 00:00:00 EDT 2020 · OSTI ID:1764477

Sister Rod Destructive Examinations (FY20)
Technical Report · Sun Nov 29 23:00:00 EST 2020 · OSTI ID:1764465

Sister Rod Destructive Examinations (FY23) Appendix A: Full-Length Rod Heat Treatments
Technical Report · Tue Jan 30 23:00:00 EST 2024 · OSTI ID:2341395