Fermilab Accelerator Upgrade: Phase 1
The long range Fermilab program requires maintaining a viable physics program into the late 1990’s when the SSC will begin operation. The program calls for doubling the integrated luminosity with each succeeding run until peak luminosities of >5 x 1031 cm-2 s-1, or an integrated luminosity per run in excess of 100 pb-1 is achieved, effectively doubling the mass range accessable for discovery. In order to achieve this goal we present a highly challenging upgrade of the present Tevatron proton accelerator and proton-antiproton collider.
- Research Organization:
- Fermi National Accelerator Laboratory (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE Office of Science (SC), High Energy Physics (HEP)
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 1764153
- Report Number(s):
- FERMILAB-DESIGN--1989-03; oai:inspirehep.net:1122294
- Country of Publication:
- United States
- Language:
- English
Similar Records
Proceedings of the Fermilab III Instabilities Workshop, Held at Fermilab, June 25-29, 1990
Activities at Fermilab related to collider present and future
Tevatron Run II Handbook
Technical Report
·
Wed Aug 15 00:00:00 EDT 1990
·
OSTI ID:1151510
Activities at Fermilab related to collider present and future
Conference
·
Sat Oct 31 23:00:00 EST 1992
· AIP Conference Proceedings (American Institute of Physics); (United States)
·
OSTI ID:5334533
Tevatron Run II Handbook
Technical Report
·
Wed Dec 31 23:00:00 EST 1997
·
OSTI ID:1985109