Salt Heater Test (FY19), Rev. 2

Technical Report ·
DOI:https://doi.org/10.2172/1763224· OSTI ID:1763224
 [1];  [1];  [1];  [1];  [1];  [1];  [1];  [1];  [2];  [2];  [2];  [2];  [2];  [2];  [2];  [3];  [3];  [3];  [4]
  1. Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)
  2. Los Alamos National Lab. (LANL), Los Alamos, NM (United States)
  3. Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)
  4. National Energy Technology Lab. (NETL), Pittsburgh, PA, and Morgantown, WV (United States)

This report summarizes the 2019 fiscal year (FY19) status of the borehole heater test in salt funded by the US Department of Energy Office of Nuclear Energy (DOE-NE) Spent Fuel and Waste Science & Technology (SFWST) campaign. This report satisfies SFWST level-three milestone report M3SF-19SN010303033. This report is an update of the April 2019 level-two milestone report M2SF-19SNO10303031 to reflect the nearly complete as-built status of the borehole heater test. This report discusses the fiscal year 2019 (FY19) design, implementation, and preliminary data interpretation plan for a set of borehole heater tests call the brine availability tests in salt (BATS), which is funded by the DOE Office of Nuclear Energy (DOE-NE) at the Waste Isolation Pilot Plant (WIPP), a DOE Office of Environmental Management (DOE-EM) site. The organization of BATS is outlined in Project Plan: Salt In-Situ Heater Test (SNL, 2018). An early design of the field test is laid out in Kuhlman et al. (2017), including extensive references to previous field tests, which illustrates aspects of the present test. The previous test plan by Stauffer et al. (2015) places BATS in the context of a multi-year testing strategy, which involves tests of multiple scales and processes, eventually culminating in a drift-scale disposal demonstration. This level-3 milestone report is an update of a level-2 milestone report from April 2019 by the same name. The update adds as-built details of the heater test, which at the time of writing (August 2019) is near complete implementation.

Research Organization:
Sandia National Laboratories (SNL-NM), Albuquerque, NM (United States)
Sponsoring Organization:
USDOE Office of Nuclear Energy (NE), Fuel Cycle Technologies (NE-5)
DOE Contract Number:
AC04-94AL85000; NA0003525
OSTI ID:
1763224
Report Number(s):
SAND--2019-10240R; 678961
Country of Publication:
United States
Language:
English

Similar Records

Salt Heater Test (FY19)
Technical Report · Tue Apr 30 00:00:00 EDT 2019 · OSTI ID:1559568

FY20 Update on Brine Availability Test in Salt. Revision 4
Technical Report · Sat Aug 01 00:00:00 EDT 2020 · OSTI ID:1657890

Brine Availability Test in Salt (BATS) FY21 Update
Technical Report · Tue Aug 31 00:00:00 EDT 2021 · OSTI ID:1821547