Performance Specification 01000S, Building XXX Institutional General Plant Project
Design and construct a high-bay facility with penthouse mechanical area that meets the physical and functional requirements as described in this document. Using the Modular High Bay Programming Plan, contractor shall validate programming requirements including equipment to be installed; room sizes and quantities; heating, ventilation, and air- conditioning (HVAC) and electrical requirements, including sizing of equipment based on heat load; and other specific needs. Contractor shall provide the design development, engineering, construction drawings, construction and construction administration services required to completely define, document, and construct the facility to the requirements described in the Building XXX Programming Plan and those referenced herein.
- Research Organization:
- Sandia National Laboratories (SNL-NM), Albuquerque, NM (United States)
- Sponsoring Organization:
- USDOE National Nuclear Security Administration (NNSA)
- DOE Contract Number:
- AC04-94AL85000; NA0003525
- OSTI ID:
- 1734462
- Report Number(s):
- SAND--2018-7950R; 665980
- Country of Publication:
- United States
- Language:
- English
Similar Records
Energy conservation regulations for new nonresidential buildings. Guide to HVAC equipment, Division Six
National Ignition Facility subsystem design requirements laser {ampersand} target area building (LTAB) SSDR 1.2.2.1
Cold Vacuum Drying facility HVAC system design description (SYS 30-1 THRU 30-5)
Technical Report
·
Mon Sep 01 00:00:00 EDT 1980
·
OSTI ID:6879169
National Ignition Facility subsystem design requirements laser {ampersand} target area building (LTAB) SSDR 1.2.2.1
Technical Report
·
Mon Aug 19 00:00:00 EDT 1996
·
OSTI ID:595008
Cold Vacuum Drying facility HVAC system design description (SYS 30-1 THRU 30-5)
Technical Report
·
Fri Jul 02 00:00:00 EDT 1999
·
OSTI ID:797515