Electric Power Research Institute, Environmental Control Technology Center report to the Steering Committee. Final technical report
Operations and maintenance continued this month at the Electric Power Research Institute`s Environmental Control Technology Center. Testing on the 4.0 MW Pilot Wet FGD unit continued this month with the Trace Element Removal (TER) test block, and a simultaneous testing of the Lime Forced Oxidation process with DBA addition (LDG). At the end of the month, a series of Duct Injection tests began in a study to determine the efficiencies of alkaline injection for removing trace elements (mercury). On the Cold-Side Selective Catalytic Reduction (SCR) unit, low temperature performance testing continued this month as measurements were taken for NO{sub x} removal efficiency, residual ammonia slip, and SO{sub 3} generation across the catalysts installed in the SCR reactor. This report describes the status of the facilities and test activities at the pilot and mini-pilot plants.
- Research Organization:
- Electric Power Research Inst. (EPRI), Palo Alto, CA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- FG22-94PC93256
- OSTI ID:
- 171251
- Report Number(s):
- DOE/PC/93256-T13; ON: DE96004086; TRN: AHC29602%%13
- Resource Relation:
- Other Information: PBD: Jul 1995
- Country of Publication:
- United States
- Language:
- English
Similar Records
Electric Power Research Institute: Environmental control technology. Final technical monthly report
Electric Power Research Institute, Environmental Control Technology Center report to the steering committee. Final technical report
Related Subjects
01 COAL, LIGNITE, AND PEAT
WASTE PROCESSING PLANTS
PERFORMANCE TESTING
FLUE GAS
DESULFURIZATION
DENITRIFICATION
DEMETALLIZATION
DEASHING
NITROGEN OXIDES
SELECTIVE CATALYTIC REDUCTION
MERCURY
REMOVAL
PROGRESS REPORT
EPRI
TEST FACILITIES
PILOT PLANTS
CALCIUM OXIDES
FLUID INJECTION
GYPSUM
FLY ASH
SCRUBBERS
COMPILED DATA