Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Scenarios for an 8 GeV Linac “Booster Replacement”

Technical Report ·
DOI:https://doi.org/10.2172/1690258· OSTI ID:1690258
 [1]
  1. Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)

Increasing the Main Injector (MI) beam power above ~1.2 MW requires replacement of the 8 GeV Booster by a higher intensity alternative. In the Project X era, rapid-cycling synchrotron (RCS) and Linac solutions were considered for this purpose. In this paper, we consider the Linac version that produces 8 GeV H- beam for injection into the Recycler Ring (RR) or Main Injector (MI). Starting from the Project X version, which has a 3 GeV cw segment followed by a 3-8 GeV pulsed linac, we consider alternative configurations. SRF improvements and changes in physics requirements may enable shorter linac configurations and different configurations of pulsed and cw components. Direct injection into the MI has advantages, but may conflict with MI-10 extraction for LBNF.

Research Organization:
Fermi National Accelerator Laboratory (FNAL), Batavia, IL (United States)
Sponsoring Organization:
USDOE Office of Science (SC), High Energy Physics (HEP)
DOE Contract Number:
AC02-07CH11359
OSTI ID:
1690258
Report Number(s):
FERMILAB-TM-2745-AD; oai:inspirehep.net:1826579
Country of Publication:
United States
Language:
English

Similar Records

An 8 GeV Linac as the Booster Replacement in the Fermilab Power Upgrade
Conference · Tue Aug 10 00:00:00 EDT 2021 · JACoW · OSTI ID:1829485

An 8 GeV Linac as the Booster Replacement in the Fermilab Power Upgrade
Technical Report · Tue Oct 26 00:00:00 EDT 2021 · OSTI ID:1827261

An 8 GEV Linac As The Booster Replacement In The Fermilab Power Upgrade
Conference · Thu Dec 31 23:00:00 EST 2020 · OSTI ID:1883587