Title: Permitting plan for the high-level waste interim storage

Technical Report ·
DOI:https://doi.org/10.2172/16899· OSTI ID:16899

This document addresses the environmental permitting requirements for the transportation and interim storage of solidified high-level waste (HLW) produced during Phase 1 of the Hanford Site privatization effort. Solidified HLW consists of canisters containing vitrified HLW (glass) and containers that hold cesium separated during low-level waste pretreatment. The glass canisters and cesium containers will be transported to the Canister Storage Building (CSB) in a U.S. Department of Energy (DOE)-provided transportation cask via diesel-powered tractor trailer. Tri-Party Agreement (TPA) Milestone M-90 establishes a new major milestone, and associated interim milestones and target dates, governing acquisition and/or modification of facilities necessary for: (1) interim storage of Tank Waste Remediation Systems (TWRS) immobilized HLW (IHLW) and other canistered high-level waste forms; and (2) interim storage and disposal of TWRS immobilized low-activity tank waste (ILAW). An environmental requirements checklist and narrative was developed to identify the permitting path forward for the HLW interim storage (HLWIS) project (See Appendix B). This permitting plan will follow the permitting logic developed in that checklist.

Sponsoring Organization:
USDOE Office of Environmental Restoration and Waste Management, Washington, DC (US)
DOE Contract Number:
AC06-96RL13200
OSTI ID:
16899
Report Number(s):
HNF-SD-ENV-EE-002; ON: DE98059744; BR: EW3130010; ON: DE98059744; BR: EW3130010; TRN: US0111098
Resource Relation:
Other Information: PBD: 23 Apr 1997; Supercedes report DE98059744; PBD: 23 Apr 1997
Country of Publication:
United States
Language:
English