Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

LANSCE Module 1 Capacitor Room Failure [Slides]

Technical Report ·
DOI:https://doi.org/10.2172/1688709· OSTI ID:1688709
 [1]
  1. Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

At ~3:30 am on Sunday, high-voltage line in capacitor room overheated to the extent that the poly insulating material caught fire and dripped melted insulation onto equipment below. LAFD responded and, per pre-incident planning, waited for AOT personnel to respond to the area. AOT personnel, safed equipment and waited with LAFD for fire to “burn out”. Using an IWD, AOT personnel safely re-entered the area after conducting hazards analysis and engaging SMEs, re: controls for combustion products and COVID-19 hazards. Recovery action took several days with a focus on getting it right. Beam re-start decisions were made with impacted organizations and considering AOTRFE personnel.

Research Organization:
Los Alamos National Laboratory (LANL), Los Alamos, NM (United States)
Sponsoring Organization:
USDOE National Nuclear Security Administration (NNSA)
DOE Contract Number:
89233218CNA000001
OSTI ID:
1688709
Report Number(s):
LA-UR--20-28486
Country of Publication:
United States
Language:
English

Similar Records

LAFD: TA-3 NISC & SCC Facility Familiarization Tour, OJT #53356
Technical Report · Tue Oct 24 00:00:00 EDT 2017 · OSTI ID:1402672

LAFD: TA-16 HE Facility Familiarization Tour, OJT 55258
Technical Report · Wed May 31 00:00:00 EDT 2017 · OSTI ID:1361463

LAFD: TA-55 General Facility Familiarization Tour, Course #55261
Technical Report · Tue Jan 09 23:00:00 EST 2018 · OSTI ID:1417146