W-320 waste retrieval sluicing system transfer line flushing volume and frequency calculation
The calculations contained in this analysis document establish the technical basis for the volume, frequency, and flushing fluid to be utilized for routine Waste Retrieval Sluicing System (WRSS) process line flushes. The WRSS was installed by Project W-320, Tank 241-C-106 Sluicing. The double contained pipelines being flushed have 4 inch stainless steel primary pipes. The flushes are intended to prevent hydrogen buildup in the transfer lines and to provide ALARA conditions for maintenance personnel.
- Sponsoring Organization:
- USDOE Office of Environmental Restoration and Waste Management, Washington, DC (US)
- DOE Contract Number:
- AC06-96RL13200
- OSTI ID:
- 16874
- Report Number(s):
- HNF-SD-W320-ANAL--004; ON: DE98059719; BR: EW3101000; ON: DE98059719; BR: EW3101000
- Country of Publication:
- United States
- Language:
- English
Similar Records
W-320 waste retrieval sluicing system transfer line flushing volume and frequency calculation
Interim safety equipment list for 241-C-106 waste retrieval, project W-320
Tank 241-C-106 waste retrieval sluicing system process control plan
Technical Report
·
Tue Nov 04 23:00:00 EST 1997
·
OSTI ID:10148004
Interim safety equipment list for 241-C-106 waste retrieval, project W-320
Technical Report
·
Wed Jan 24 23:00:00 EST 1996
·
OSTI ID:469648
Tank 241-C-106 waste retrieval sluicing system process control plan
Technical Report
·
Sat Jul 25 00:00:00 EDT 1998
·
OSTI ID:362429