Final characterization and safety screen report of double shell tank 241-AP-105 for evaporator campaign 97-1
Evaporator candidate feed from tank 241-AP-105 (hereafter referred to as AP-105) was characterized for physical, inorganic, organic and radiochemical parameters by the 222-S Laboratory as directed by the Tank Sample and Analysis Plan (TSAP), References 1 through 4, and Engineering Change Notice, number 635332, Reference 5. This data package satisfies the requirement for a format IV, final report as described in Reference 1. This data package is also a follow-up to the 45-Day safety screen results for tank AP-105, Reference 8, which was issued on November 5, 1996, and is attached as Section II to this report. Preliminary data in the form of summary analytical tables were provided to the project in advance of this final report to enable early estimation of evaporator operational parameters, using the Predict modeling program. Analyses were performed at the 222-S Laboratory as defined and specified in the TSAP and the Laboratory's Quality Assurance P1an, References 6 and 7. Any deviations from the instructions documented in the TSAP are discussed in this narrative and are supported with additional documentation.
- Research Organization:
- Westinghouse Hanford Co., Richland, WA (US)
- Sponsoring Organization:
- USDOE Office of Environmental Restoration and Waste Management, Washington, DC (US)
- DOE Contract Number:
- AC06-96RL13200
- OSTI ID:
- 16847
- Report Number(s):
- HNF-SD-WM-DP-202 Rev 1; ON: DE98059514; BR: EW3120074
- Country of Publication:
- United States
- Language:
- English
Similar Records
Tank 241-AP-105, cores 208, 209 and 210, analytical results for the final report
Tank 241-AP-103 08/1999 Compatibility Grab Samples and Analytical Results for the Final Report