Cavity Procurement and Qualification Plan for LCLS-II
- Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States)
The LCLS-II project aims to build 35 accelerating cryomodules, which are based on the European XFEL design but modified for operation in CW mode. Each cryomodule houses eight TESLA-style nine-cell superconducting radio-frequency cavities. The activities to assemble the first two prototype cryomodules are ongoing at FNAL and JLab. 264 cavities worth of cavities for the remaining 33 cryomodules will be procured from two industrial vendors in similar quantity considering the option to produce spares. The assembly of cavities into the production cryomodules will be distributed among FNAL (16 cryomodules) and JLab (17 cryomodules). In this paper the cavity procurement and qualification plan for the LCLS-II project is detailed.
- Research Organization:
- Thomas Jefferson National Accelerator Facility, Newport News, VA (United States)
- Sponsoring Organization:
- USDOE Office of Science (SC), Nuclear Physics (NP)
- DOE Contract Number:
- AC05-06OR23177; AC02-76SF00515
- OSTI ID:
- 1644673
- Report Number(s):
- JLAB-ACC-15-2187; DOE/OR/23177-3621; TUPB003
- Country of Publication:
- United States
- Language:
- English
Similar Records
Procurements for LCLS-II Cryomodules at Jlab
The Transfer of Improved Cavity Processing Protocols to Industry for LCLS-II: N-Doping and Electropolishing