Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

10 MWE CDCL Large Pilot Plant – pre-FEED Study (Final Report)

Technical Report ·
DOI:https://doi.org/10.2172/1635266· OSTI ID:1635266
 [1];  [2];  [2];  [2];  [2]
  1. Babcock & Wilcox Power Generation Group, Inc., Barberton, OH (United States); The Babcock & Wilcox Company
  2. Babcock & Wilcox Power Generation Group, Inc., Barberton, OH (United States)
The Following Document is the Final Technical Scientific Report for the project tittle “10 MWE CDCL Large Pilot Plant – pre-FEED Study” performed by The Babcock & Wilcox Company in collaboration with The Ohio State University, Johnson & Matthey, The Electric Power Research Institute, and the Dover Light & Power Municipal Power Plant. The project Team performed a pre-Front End Engineering Design study of a 10 MWe Coal-Direct Chemical Looping power plant to be hosted at the Dover Light & Power Municipal Plant. As part of the pre-FEED study, the project Team performed multiple pilot test campaigns to obtain design and performance information at the 250 kWth CDCL pilot facility at the Babcock & Wilcox Company’s Research Center. The Techno-Economic analysis was updated based on the FEED study and the pilot tests results. The study shows that the CDCL process is a promising carbon-friendly technology capable of producing electricity with a high efficiency with a cost of electricity of $83.3 / MWh, which corresponded to less than 30% increase in cost of electricity compared to the cost of electricity of a base case study of a supercritical PC boiler.
Research Organization:
Babcock & Wilcox Power Generation Group, Inc., Barberton, OH (United States)
Sponsoring Organization:
USDOE Office of Fossil Energy (FE), Clean Coal and Carbon (FE-20)
Contributing Organization:
The Ohio State University
DOE Contract Number:
FE0027654
OSTI ID:
1635266
Report Number(s):
BWRC--RCD-1500.-DE-FE0027654-FY4Q2
Country of Publication:
United States
Language:
English

Similar Records

10 MWE CDCL Large Pilot Plant – pre-FEED Study
Technical Report · Thu Apr 30 00:00:00 EDT 2020 · OSTI ID:1638256

Update on Design of 10 MWe Iron-Based Coal Direct Chemical Looping Demonstration Plant
Conference · Sun Jun 03 00:00:00 EDT 2018 · OSTI ID:1600975

250 kWth Pilot Testing in Support of a 10 MWe Coal-Direct Chemical Looping Demonstration Feasibility Study
Conference · Sun Jun 16 00:00:00 EDT 2019 · 2019 Clean Energy Conference · OSTI ID:1600966