skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Power management and distribution system for a More-Electric Aircraft (MADMEL) -- Program status

Conference ·
OSTI ID:163339
 [1]; ; ;  [2]
  1. Wright Lab., Wright-Patterson AFB, OH (United States)
  2. Northrop/Grumman Corp., Hawthorne, CA (United States). Military Aircraft Division

A number of technology breakthroughs in recent years have rekindled the concept of a more-electric aircraft. High-power solid-state switching devices, electrohydrostatic actuators (EHAs), electromechanical actuators (EMAs), and high-power generators are just a few examples of component developments that have made dramatic improvements in properties such as weight, size, power, and cost. However, these components cannot be applied piecemeal. A complete, and somewhat revolutionary, system design approach is needed to exploit the benefits that a more-electric aircraft can provide. A five-phase Power Management and Distribution System for a More-Electric Aircraft (MADMEL) program was awarded by the Air Force to the Northrop/Grumman, Military Aircraft Division team in September 1991. The objective of the program is to design, develop, and demonstrate an advanced electrical power generation and distribution system for a more-electric aircraft (MEA). The MEA emphasizes the use of electrical power in place of hydraulics, pneumatic, and mechanical power to optimize the performance and life cycle cost of the aircraft. This paper presents an overview of the MADMEL program and a top-level summary of the program results, development and testing of major components to date. In Phase 1 and Phase 2 studies, the electrical load requirements were established and the electrical power system architecture was defined for both near-term (NT-year 1996) and far-term (FT-year 2003) MEA application. The detailed design and specification for the electrical power system (EPS), its interface with the Vehicle Management System, and the test set-up were developed under the recently completed Phase 3. The subsystem level hardware fabrication and testing will be performed under the on-going Phase 4 activities. The overall system level integration and testing will be performed in Phase 5.

OSTI ID:
163339
Report Number(s):
CONF-950729-; TRN: IM9604%%444
Resource Relation:
Conference: 30. intersociety energy conversion engineering conference, Orlando, FL (United States), 30 Jul - 5 Aug 1995; Other Information: PBD: 1995; Related Information: Is Part Of Proceedings of the 30. intersociety energy conversion engineering conference. Volume 1; Goswami, D.Y. [ed.] [Univ. of Florida, Gainesville, FL (United States)]; Kannberg, L.D.; Somasundaram, S. [eds.] [Pacific Northwest Lab., Richland, WA (United States)]; Mancini, T.R. [ed.] [Sandia National Labs., Albuquerque, NM (United States)]; PB: 798 p.
Country of Publication:
United States
Language:
English