Integrating transmission into IRP. Part 1: Analytical approach
Journal Article
·
· IEEE Transactions on Power Systems
- Univ. of Texas, Austin, TX (United States)
- Lower Colorado River Authority, Austin, TX (United States). Resource Planning and Regulatory Div.
This is Part 1 of a two paper set dealing with transmission and integrated resource planning. The primary objective of this paper is to report a framework to bring transmission and selected other resources into the sphere of integrated resource planning. Transmission lines and related equipment are indeed a resource, and may constitute either a substitute for other resources (e.g., a strengthened transmission network may reduce the need for remote generation) or a complement to other resources (e.g., additional transmission investment may be needed to facilitate power purchases from a neighboring system or an independent power producer). Moreover, growing competitive pressures make it necessary to plan transmission systems to facilitate competition among alternative generation and demand-side resources. A combined transmission and integrated resource planning model, called the Comprehensive Electrical Systems Planning Model (CESPLAN), is described in this paper. Part 2 reports some case study results designed to illustrate the model`s features.
- OSTI ID:
- 163070
- Report Number(s):
- CONF-950103--
- Journal Information:
- IEEE Transactions on Power Systems, Journal Name: IEEE Transactions on Power Systems Journal Issue: 3 Vol. 10; ISSN ITPSEG; ISSN 0885-8950
- Country of Publication:
- United States
- Language:
- English
Similar Records
Integrating transmission into IRP. Part 2: Case study results
Transmission Challenges and Best Practices for Cost-Effective Renewable Energy Delivery across State and Provincial Boundaries
Transmission Challenges and Best Practices for Cost-Effective Renewable Energy Delivery across State and Provincial Boundaries
Journal Article
·
Tue Aug 01 00:00:00 EDT 1995
· IEEE Transactions on Power Systems
·
OSTI ID:163071
Transmission Challenges and Best Practices for Cost-Effective Renewable Energy Delivery across State and Provincial Boundaries
Technical Report
·
Tue Mar 21 00:00:00 EDT 2017
·
OSTI ID:1348385
Transmission Challenges and Best Practices for Cost-Effective Renewable Energy Delivery across State and Provincial Boundaries
Technical Report
·
Tue Aug 22 00:00:00 EDT 2017
·
OSTI ID:1378905