Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Integrating transmission into IRP. Part 1: Analytical approach

Journal Article · · IEEE Transactions on Power Systems
DOI:https://doi.org/10.1109/59.466467· OSTI ID:163070
;  [1];  [2]
  1. Univ. of Texas, Austin, TX (United States)
  2. Lower Colorado River Authority, Austin, TX (United States). Resource Planning and Regulatory Div.
This is Part 1 of a two paper set dealing with transmission and integrated resource planning. The primary objective of this paper is to report a framework to bring transmission and selected other resources into the sphere of integrated resource planning. Transmission lines and related equipment are indeed a resource, and may constitute either a substitute for other resources (e.g., a strengthened transmission network may reduce the need for remote generation) or a complement to other resources (e.g., additional transmission investment may be needed to facilitate power purchases from a neighboring system or an independent power producer). Moreover, growing competitive pressures make it necessary to plan transmission systems to facilitate competition among alternative generation and demand-side resources. A combined transmission and integrated resource planning model, called the Comprehensive Electrical Systems Planning Model (CESPLAN), is described in this paper. Part 2 reports some case study results designed to illustrate the model`s features.
OSTI ID:
163070
Report Number(s):
CONF-950103--
Journal Information:
IEEE Transactions on Power Systems, Journal Name: IEEE Transactions on Power Systems Journal Issue: 3 Vol. 10; ISSN ITPSEG; ISSN 0885-8950
Country of Publication:
United States
Language:
English

Similar Records

Integrating transmission into IRP. Part 2: Case study results
Journal Article · Tue Aug 01 00:00:00 EDT 1995 · IEEE Transactions on Power Systems · OSTI ID:163071

Transmission Challenges and Best Practices for Cost-Effective Renewable Energy Delivery across State and Provincial Boundaries
Technical Report · Tue Mar 21 00:00:00 EDT 2017 · OSTI ID:1348385

Transmission Challenges and Best Practices for Cost-Effective Renewable Energy Delivery across State and Provincial Boundaries
Technical Report · Tue Aug 22 00:00:00 EDT 2017 · OSTI ID:1378905