The ETROC Project: Precision Timing ASIC Development for LGAD-based CMS Endcap Timing Layer (ETL) Upgrade
more »
- Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
- Southern Methodist Univ., Dallas, TX (United States)
- Northwestern Univ., Evanston, IL (United States)
- Kyungpook National Univ., Daegu (Korea, Republic of)
The ETROC (Endcap Timing Readout Chip) is being developed for the LGAD-based CMS Endcap Timing Layer (ETL) at HL-LHC. The ETL on each side of the interaction region will be instrumented with a two-disk system of MIP-sensitive LGAD silicon devices to be read out by ETROCs for precision timing measurement with down to 30 ps timing resolution. The ETROC is designed to handle a 16 x 16 pixel cell matrix, with each pixel cell being 1.3 mm x 1.3 mm to match the LGAD sensor pixel size. Approximately 15% of the sensors near the highest eta region will experience hadron fluence above 1e15 neq/cm² towards end of operation of HL-LHC, resulting in small signal amplitude with LGAD gain reduced to around 10. For this reason, the front-end design for preamplifier and discriminator has been specifically optimized for the reduced LGAD signals, with enough flexibilities to meet the ETL specific needs for time resolution, power budget and radiation profile.
- Research Organization:
- Fermi National Accelerator Laboratory (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE Office of Science (SC), High Energy Physics (HEP) (SC-25)
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 1623361
- Report Number(s):
- FERMILAB-POSTER--19-119-E; oai:inspirehep.net:1796314
- Country of Publication:
- United States
- Language:
- English
Similar Records
Characterization of the CMS Endcap Timing Layer readout chip prototype with charge injection
The Analog Front-end for the LGAD Based Precision Timing Application in CMS ETL
The ETROC2 prototype for CMS MTD Endcap Timing Layer (ETL) upgrade
Journal Article
·
Tue Jun 29 20:00:00 EDT 2021
· Journal of Instrumentation
·
OSTI ID:1830388
The Analog Front-end for the LGAD Based Precision Timing Application in CMS ETL
Journal Article
·
Sun Dec 27 23:00:00 EST 2020
· TBD
·
OSTI ID:1834179
The ETROC2 prototype for CMS MTD Endcap Timing Layer (ETL) upgrade
Conference
·
Sun Nov 17 23:00:00 EST 2024
· No journal information
·
OSTI ID:2477821