W87-1 Modification Program (Maintaining the Stockpile)
Program Document
·
OSTI ID:1614715
NNSA resumed work on a W78 warhead replacement, designated as the W87-1, in fiscal year (FY) 2019 following the 2018 Nuclear Posture Review. By replacing the legacy W78, the W87-1 will maintain continuity for the ground-based leg of the U.S. nuclear deterrent. The warhead is named the W87-1 to reflect that it has a similar primary design to the W87-0 and will fly in a similar reentry vehicle. The W87-1 is based on a previously-tested nuclear component and will include an insensitive high explosive primary that had been designed and tested with advanced safety features. The warhead will be fielded by FY 2030 on the U.S. Air Force (USAF)’s Ground Based Strategic Deterrent. The W87-1 will not provide new military capabilities, yet it will provide enhanced safety and security compared to the legacy W78. The W87-1 will be certified without the need for additional underground nuclear explosive testing.
- Research Organization:
- National Nuclear Security Administration
- Sponsoring Organization:
- USDOE National Nuclear Security Administration (NNSA)
- OSTI ID:
- 1614715
- Country of Publication:
- United States
- Language:
- English
Similar Records
W80-4 Life Extension Program (Maintaining the Stockpile)
Warhead Activities (Life Extension Programs, Modifications, and Alterations)
ICBM Transition Tool
Program Document
·
Mon Dec 31 23:00:00 EST 2018
·
OSTI ID:1614714
Warhead Activities (Life Extension Programs, Modifications, and Alterations)
Program Document
·
Mon Dec 31 23:00:00 EST 2018
·
OSTI ID:1614748
ICBM Transition Tool
Technical Report
·
Mon Sep 09 00:00:00 EDT 2024
·
OSTI ID:2440178