Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Engineering task plan TWRS technical baseline completion

Technical Report ·
DOI:https://doi.org/10.2172/16104· OSTI ID:16104

The Tank Waste Remediation System (TWRS) includes many activities required to remediate the radioactive waste stored in underground waste storage tanks. These activities include routine monitoring of the waste, facilities maintenance, upgrades to existing equipment, and installation of new equipment necessary to manage, retrieve, process, and dispose of the waste. In order to ensure that these multiple activities are integrated, cost effective, and necessary, a sound technical baseline is required from which all activities can be traced and measured. The process by which this technical baseline is developed will consist of the identification of functions, requirements, architecture, and test (FRAT) methodology. This process must be completed for TWRS to a level that provides the technical basis for all facility/system/component maintenance, upgrades, or new equipment installation.

Sponsoring Organization:
(US)
DOE Contract Number:
AC06-96RL13200
OSTI ID:
16104
Report Number(s):
WHC-SD-WM-ETP--188; ON: DE97052767; BR: EW3120075
Country of Publication:
United States
Language:
English