Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

A new pipelaying experience -- Piggyback to dual lay

Conference ·
OSTI ID:160717

On the British Gas North Morecambe Development Project in 1993, the derrick-lay barge DLB 1601 used a dual lay operation. A 3 inch {O} pipeline was laid piggybacked onto a 36 inch {O} pipeline for the shore pull operation and then separated to follow a dual lay for the offshore section. Transformation for piggyback laying mode to the dual lay mode was performed making use of a newly developed transition operation. This paper reports the challenges which had to be met to ensure a successful outcome. Results of various engineering studies are first presented. The set-up and observations of the (onshore) prototype testing are then described. Lastly, the special measures taken for the transition operation and certain field observations during the installation phase are briefly discussed. It is believed that the information presented in this paper will be of use to other similar projects in the future.

OSTI ID:
160717
Report Number(s):
CONF-950501--
Country of Publication:
United States
Language:
English

Similar Records

Sequential piggyback, dual lay used for Irish Sea pipelines
Journal Article · Mon Sep 04 00:00:00 EDT 1995 · Oil and Gas Journal · OSTI ID:99292

North Morecambe employs innovative transition operation
Journal Article · Mon Sep 11 00:00:00 EDT 1995 · Oil and Gas Journal · OSTI ID:99296

Liverpool Bay piggybacked gas pipeline installed with bottom tow
Journal Article · Sun Dec 24 23:00:00 EST 1995 · Oil and Gas Journal · OSTI ID:153745