Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Enserch Garden Banks 388 field development template tie-back of existing subsea satellite wells

Conference ·
OSTI ID:160644

The Flowline Jumper System (FJS) will be used by Enserch Exploration, Inc. to tie in three existing wells to the 24 well production template installed in Garden Banks Block 388. The FJS allows these existing satellite wells to be connected to the production template via standard wellbays, eliminating the need for dedicated receiver structures, or tie-in porches. Wellbays used for satellite well tie-ins are available for use as template wells following the removal of the jumper. This paper describes the considerations that led to the selection and influenced the design of the FJS. The advantages of vertical jumper systems are fully discussed with respect to the GB-388 Project. A description of the major components and how they interface with the template is included to provide a better understanding of the FJS. Also included is an outline of the System Integration Testing (SIT) of the FJS.

OSTI ID:
160644
Report Number(s):
CONF-950501--
Country of Publication:
United States
Language:
English