LBNF CMGC Delivery Method: ICE Process
Conference
·
OSTI ID:1605572
- Fermilab
The Construction Manager/General Contractor (CM/GC) delivery method is intended to benefit the design process, value engineering, risk mitigation, and schedule optimization while promoting construction and design innovation. This delivery method is particularly suited for complex projects that require significant consideration of contractor means and methods. Fermilab’s Far Site Conventional Facilities proceeded with a CM/GC delivery method to account for the unique conditions of excavating over 300,000 cubic yards of rock in tunnels and caverns that will be constructed approximately 5000-ft deep in the repurposed Homestake Mine in Lead, SD. The experiences of the Independent Cost Estimating (ICE) process are presented.
- Research Organization:
- Fermi National Accelerator Laboratory (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE Office of Science (SC), High Energy Physics (HEP) (SC-25)
- Contributing Organization:
- DUNE
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 1605572
- Report Number(s):
- FERMILAB-CONF-19-641-LBNF; oai:inspirehep.net:1787004
- Country of Publication:
- United States
- Language:
- English
Similar Records
The LBNF/DUNE Complex for Neutrino Science
A tunnel boring system for the Yucca Mountain Project
Advances in technology for the construction of deep-underground facilities
Conference
·
Wed Apr 03 00:00:00 EDT 2024
·
OSTI ID:2371025
A tunnel boring system for the Yucca Mountain Project
Conference
·
Fri Dec 30 23:00:00 EST 1994
·
OSTI ID:60798
Advances in technology for the construction of deep-underground facilities
Conference
·
Wed Dec 30 23:00:00 EST 1987
·
OSTI ID:10176140