Contingency Contractor Optimization Engineering Prototype – Release 2.3 (Phase 3 Extension – Training Examples)
- Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)
- Cornell Univ., Ithaca, NY (United States)
This document provides training examples to provide users practice in using the tool. Detailed instructions on how to use the tool can be found in the User Manual (SAND2015-6028).The Contingency Contractor Optimization project is intended to address former Secretary Gates’ mandate in a January 2011 memo and DoDI 3020.41 by delivering a centralized strategic planning tool that allows senior decision makers to quickly and accurately assess the impacts, risks, and mitigation strategies associated with utilizing contract support. Based on an electronic storyboard prototype developed in Phase 2, the CCOT-P engineering prototype was refined in Phase 3 of the OSD ATL Contingency Contractor Optimization project to support strategic planning for contingency contractors. CCOT-P uses a model to optimize the total workforce mix by minimizing the combined total costs for the selected mission scenarios. The model will optimize the match of personnel groups (military, DoD civilian, and contractors) and capabilities to meet the mission requirements as effectively as possible, based on risk, cost, and other requirements.
- Research Organization:
- Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)
- Sponsoring Organization:
- USDOE National Nuclear Security Administration (NNSA)
- DOE Contract Number:
- AC04-94AL85000
- OSTI ID:
- 1603859
- Report Number(s):
- SAND-2016-0908; 684342
- Country of Publication:
- United States
- Language:
- English
Similar Records
Contingency Contractor Optimization Phase 3 User Manual - Contingency Contractor Optimization Tool Prototype - Release 2.2
Contingency Contractor Optimization Phase 3 Extension Quick Start Guide: Contingency Contractor Optimization Tool - Engineering Prototype (Release 2.3)