Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Contingency Contractor Optimization Tool Prototype (Phase 3 Extension- Analyst Tutorial)

Technical Report ·
DOI:https://doi.org/10.2172/1603858· OSTI ID:1603858

This tutorial walks the user through analysis examples using the Contingency Contractor Optimization Tool Prototype. The examples are designed to showcase key capabilities of the tool. The main goal of this tutorial is to provide examples of how to use the tool to perform analyses to those users acting in the analyst role. All examples and locations used in the prototype are fictional, but are intended to be realistic. Users reading this manual are expected to have a basic understanding and familiarity with the Contingency Contractor Optimization Tool Prototype. This tutorial includes scenarios for the occurrence of two wars, Prussia and New Granada.

Research Organization:
Sandia National Laboratories (SNL-NM), Albuquerque, NM (United States)
Sponsoring Organization:
USDOE National Nuclear Security Administration (NNSA)
DOE Contract Number:
AC04-94AL85000
OSTI ID:
1603858
Report Number(s):
SAND--2016-0907; 684341
Country of Publication:
United States
Language:
English