Pantex Plant Ogallala Aquifer and Perched Groundwater Contingency Plan
A Long Term Monitoring System Design has been designed to monitor conditions in the perched groundwater including changes in the perched aquifer as a result of implementing the response actions. Monitoring is required for verifying the effectiveness of perched groundwater response actions (i.e., conditions in the perched aquifer are being affected as intended) and for confirming that the perched aquifer and Ogallala Aquifer characterization as defined in the Resource Conservation and Recovery Act Facility Investigation Report and the Corrective Measure Studies/Feasibility Study remains accurate. If monitoring results obtained through the monitoring network identify an unexpected conditions or deviation, contingent actions will be considered and implemented as necessary to ensure continued protection of the Ogallala Aquifer and human health and the environment.
- Research Organization:
- Pantex Plant (PTX), Amarillo, TX (United States)
- Sponsoring Organization:
- USDOE
- Contributing Organization:
- Consolidated Nuclear Security, LLC
- DOE Contract Number:
- NA0001942
- OSTI ID:
- 1583160
- Report Number(s):
- IROS--12981
- Country of Publication:
- United States
- Language:
- English
Similar Records
Pantex Plant Ogallala Aquifer and Perched Groundwater Contingency Plan
Investigation of groundwater recirculation for the removal of RDX from the Pantex Plant perched aquifer
Update to the Long-Term Monitoring System Design Report for USDOE/NNSA Pantex Plant Groundwater Remedial Action Progress
Technical Report
·
Fri Feb 28 23:00:00 EST 2025
·
OSTI ID:2540106
Investigation of groundwater recirculation for the removal of RDX from the Pantex Plant perched aquifer
Technical Report
·
Wed Jul 01 00:00:00 EDT 1998
·
OSTI ID:663397
Update to the Long-Term Monitoring System Design Report for USDOE/NNSA Pantex Plant Groundwater Remedial Action Progress
Technical Report
·
Thu Aug 01 00:00:00 EDT 2019
·
OSTI ID:1583132